Underbalanced drilling in depleted formation achieves great success

Case study

Arash Shadravan, Mohammad Khodadadian, Abbas Roohi, Mahmood Amani

Research output: Chapter in Book/Report/Conference proceedingConference contribution

1 Citation (Scopus)

Abstract

The PR-70 well, the third well of the National Iranian Drilling Company (NIDC) UBD campaign in Parsi field, is the first well to produce while drilling in a 2-year underbalanced drilling (UBD) project in the field. NIDC and Weatherford selected the UBD technique because of the depleted reservoir pressure, which had dropped to 2, 728 psi at depth of 2, 755m (5.8 ppg). Drilling such a depleted reservoir with conventional mud would have caused a huge overbalanced state, loss of circulation, and increased possibility of blowouts or damage to the reservoir. Another reason for implementing the UBD technique was to increase productivity of the well by decreasing formation damage that resulted from drilling fluid losses.This paper explains the execution of UBD technique at well PR-70. It also discusses the well design, UBD design parameters, underbalanced modeling considerations and the lessons learned from this job that all led to the success of this project. As soon as the well started to produce oil, UBD conditions were established and continued to TD.

Original languageEnglish
Title of host publicationSociety of Petroleum Engineers - EUROPEC/EAGE Conference and Exhibition 2009
PublisherSociety of Petroleum Engineers
ISBN (Print)9781613994276
Publication statusPublished - 1 Jan 2009
Event2009 SPE EUROPEC/EAGE Annual Conference and Exhibition - Amsterdam, Netherlands
Duration: 8 Jun 200911 Jun 2009

Other

Other2009 SPE EUROPEC/EAGE Annual Conference and Exhibition
CountryNetherlands
CityAmsterdam
Period8/6/0911/6/09

Fingerprint

Underbalanced drilling
drilling
Drilling
Blowouts
Drilling fluids
Industry
Oils
damage
Productivity
drilling fluid
mud

ASJC Scopus subject areas

  • Geotechnical Engineering and Engineering Geology
  • Geochemistry and Petrology

Cite this

Shadravan, A., Khodadadian, M., Roohi, A., & Amani, M. (2009). Underbalanced drilling in depleted formation achieves great success: Case study. In Society of Petroleum Engineers - EUROPEC/EAGE Conference and Exhibition 2009 Society of Petroleum Engineers.

Underbalanced drilling in depleted formation achieves great success : Case study. / Shadravan, Arash; Khodadadian, Mohammad; Roohi, Abbas; Amani, Mahmood.

Society of Petroleum Engineers - EUROPEC/EAGE Conference and Exhibition 2009. Society of Petroleum Engineers, 2009.

Research output: Chapter in Book/Report/Conference proceedingConference contribution

Shadravan, A, Khodadadian, M, Roohi, A & Amani, M 2009, Underbalanced drilling in depleted formation achieves great success: Case study. in Society of Petroleum Engineers - EUROPEC/EAGE Conference and Exhibition 2009. Society of Petroleum Engineers, 2009 SPE EUROPEC/EAGE Annual Conference and Exhibition, Amsterdam, Netherlands, 8/6/09.
Shadravan A, Khodadadian M, Roohi A, Amani M. Underbalanced drilling in depleted formation achieves great success: Case study. In Society of Petroleum Engineers - EUROPEC/EAGE Conference and Exhibition 2009. Society of Petroleum Engineers. 2009
Shadravan, Arash ; Khodadadian, Mohammad ; Roohi, Abbas ; Amani, Mahmood. / Underbalanced drilling in depleted formation achieves great success : Case study. Society of Petroleum Engineers - EUROPEC/EAGE Conference and Exhibition 2009. Society of Petroleum Engineers, 2009.
@inproceedings{6261c81f1fa6460292ae51c857603ea5,
title = "Underbalanced drilling in depleted formation achieves great success: Case study",
abstract = "The PR-70 well, the third well of the National Iranian Drilling Company (NIDC) UBD campaign in Parsi field, is the first well to produce while drilling in a 2-year underbalanced drilling (UBD) project in the field. NIDC and Weatherford selected the UBD technique because of the depleted reservoir pressure, which had dropped to 2, 728 psi at depth of 2, 755m (5.8 ppg). Drilling such a depleted reservoir with conventional mud would have caused a huge overbalanced state, loss of circulation, and increased possibility of blowouts or damage to the reservoir. Another reason for implementing the UBD technique was to increase productivity of the well by decreasing formation damage that resulted from drilling fluid losses.This paper explains the execution of UBD technique at well PR-70. It also discusses the well design, UBD design parameters, underbalanced modeling considerations and the lessons learned from this job that all led to the success of this project. As soon as the well started to produce oil, UBD conditions were established and continued to TD.",
author = "Arash Shadravan and Mohammad Khodadadian and Abbas Roohi and Mahmood Amani",
year = "2009",
month = "1",
day = "1",
language = "English",
isbn = "9781613994276",
booktitle = "Society of Petroleum Engineers - EUROPEC/EAGE Conference and Exhibition 2009",
publisher = "Society of Petroleum Engineers",

}

TY - GEN

T1 - Underbalanced drilling in depleted formation achieves great success

T2 - Case study

AU - Shadravan, Arash

AU - Khodadadian, Mohammad

AU - Roohi, Abbas

AU - Amani, Mahmood

PY - 2009/1/1

Y1 - 2009/1/1

N2 - The PR-70 well, the third well of the National Iranian Drilling Company (NIDC) UBD campaign in Parsi field, is the first well to produce while drilling in a 2-year underbalanced drilling (UBD) project in the field. NIDC and Weatherford selected the UBD technique because of the depleted reservoir pressure, which had dropped to 2, 728 psi at depth of 2, 755m (5.8 ppg). Drilling such a depleted reservoir with conventional mud would have caused a huge overbalanced state, loss of circulation, and increased possibility of blowouts or damage to the reservoir. Another reason for implementing the UBD technique was to increase productivity of the well by decreasing formation damage that resulted from drilling fluid losses.This paper explains the execution of UBD technique at well PR-70. It also discusses the well design, UBD design parameters, underbalanced modeling considerations and the lessons learned from this job that all led to the success of this project. As soon as the well started to produce oil, UBD conditions were established and continued to TD.

AB - The PR-70 well, the third well of the National Iranian Drilling Company (NIDC) UBD campaign in Parsi field, is the first well to produce while drilling in a 2-year underbalanced drilling (UBD) project in the field. NIDC and Weatherford selected the UBD technique because of the depleted reservoir pressure, which had dropped to 2, 728 psi at depth of 2, 755m (5.8 ppg). Drilling such a depleted reservoir with conventional mud would have caused a huge overbalanced state, loss of circulation, and increased possibility of blowouts or damage to the reservoir. Another reason for implementing the UBD technique was to increase productivity of the well by decreasing formation damage that resulted from drilling fluid losses.This paper explains the execution of UBD technique at well PR-70. It also discusses the well design, UBD design parameters, underbalanced modeling considerations and the lessons learned from this job that all led to the success of this project. As soon as the well started to produce oil, UBD conditions were established and continued to TD.

UR - http://www.scopus.com/inward/record.url?scp=85058051344&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=85058051344&partnerID=8YFLogxK

M3 - Conference contribution

SN - 9781613994276

BT - Society of Petroleum Engineers - EUROPEC/EAGE Conference and Exhibition 2009

PB - Society of Petroleum Engineers

ER -